India Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear

Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central data was reported at 127.270 MW in Nov 2025. This stayed constant from the previous number of 127.270 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central data is updated monthly, averaging 127.160 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 275.780 MW in Jan 2015 and a record low of 37.410 MW in Aug 2009. Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
127.270 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central

Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central data was reported at 10.409 MW in Nov 2025. This stayed constant from the previous number of 10.409 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central data is updated monthly, averaging 8.840 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 10.409 MW in Nov 2025 and a record low of 4.840 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
10.409 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central

Electricity: Installed Capacity: Utilities: Nuclear: Delhi

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Delhi data was reported at 153.382 MW in Nov 2025. This stayed constant from the previous number of 153.382 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Delhi data is updated monthly, averaging 122.080 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 153.382 MW in Nov 2025 and a record low of 47.080 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Delhi data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
153.382 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Delhi from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Delhi

Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central data was reported at 123.042 MW in Nov 2025. This stayed constant from the previous number of 123.042 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central data is updated monthly, averaging 109.160 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 123.042 MW in Nov 2025 and a record low of 76.160 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
123.042 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central

Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh data was reported at 42.224 MW in Nov 2025. This stayed constant from the previous number of 42.224 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh data is updated monthly, averaging 34.080 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 42.224 MW in Nov 2025 and a record low of 14.080 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
42.224 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh

Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir data was reported at 95.126 MW in Nov 2025. This stayed constant from the previous number of 95.126 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir data is updated monthly, averaging 77.000 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 95.126 MW in Nov 2025 and a record low of 67.980 MW in Mar 2025. Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
95.126 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir

Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra data was reported at 1,068.660 MW in Nov 2025. This stayed constant from the previous number of 1,068.660 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra data is updated monthly, averaging 690.140 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 1,068.660 MW in Nov 2025 and a record low of 690.000 MW in May 2023. Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
1,068.660 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra

Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central data was reported at 1,068.660 MW in Nov 2025. This stayed constant from the previous number of 1,068.660 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central data is updated monthly, averaging 690.140 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 1,068.660 MW in Nov 2025 and a record low of 690.000 MW in May 2023. Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
1,068.660 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central

Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central data was reported at 86.000 MW in Nov 2025. This stayed constant from the previous number of 86.000 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central data is updated monthly, averaging 52.780 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 86.000 MW in Nov 2025 and a record low of 16.280 MW in Dec 2010. Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
86.000 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central

Electricity: Installed Capacity: Utilities: Nuclear: Punjab

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Punjab data was reported at 229.089 MW in Nov 2025. This stayed constant from the previous number of 229.089 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Punjab data is updated monthly, averaging 208.040 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 229.089 MW in Nov 2025 and a record low of 151.040 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Punjab data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
229.089 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Punjab from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Punjab

Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan data was reported at 806.740 MW in Nov 2025. This stayed constant from the previous number of 806.740 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan data is updated monthly, averaging 573.000 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 806.740 MW in Nov 2025 and a record low of 469.000 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
806.740 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan

Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central data was reported at 1,448.000 MW in Nov 2025. This stayed constant from the previous number of 1,448.000 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central data is updated monthly, averaging 986.500 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 1,448.000 MW in Nov 2025 and a record low of 478.500 MW in Dec 2010. Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
1,448.000 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central

Electricity: Installed Capacity: Utilities: Nuclear: Telagana: Central

2015 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Telagana: Central data was reported at 148.730 MW in Nov 2025. This stayed constant from the previous number of 148.730 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Telagana: Central data is updated monthly, averaging 148.730 MW from Feb 2015 (Median) to Nov 2025, with 130 observations. The data reached an all-time high of 148.730 MW in Nov 2025 and a record low of 148.620 MW in Feb 2017. Electricity: Installed Capacity: Utilities: Nuclear: Telagana: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
148.730 Nov 2025 monthly Feb 2015 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Telagana: Central from Feb 2015 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Telagana: Central

Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central data was reported at 370.452 MW in Nov 2025. This stayed constant from the previous number of 370.452 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central data is updated monthly, averaging 335.720 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 370.452 MW in Nov 2025 and a record low of 203.720 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
370.452 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central

Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand data was reported at 47.508 MW in Nov 2025. This stayed constant from the previous number of 47.508 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand data is updated monthly, averaging 22.280 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 47.508 MW in Nov 2025 and a record low of 16.280 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
47.508 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand

Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central

2008 - 2025 | Monthly | MW | Central Electricity Authority

Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central data was reported at 47.508 MW in Nov 2025. This stayed constant from the previous number of 47.508 MW for Oct 2025. Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central data is updated monthly, averaging 22.280 MW from Jan 2008 (Median) to Nov 2025, with 215 observations. The data reached an all-time high of 47.508 MW in Nov 2025 and a record low of 16.280 MW in Jan 2010. Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central data remains active status in CEIC and is reported by Central Electricity Authority. The data is categorized under India Premium Database’s Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear.

Last Frequency Range
47.508 Nov 2025 monthly Jan 2008 - Nov 2025

View India's Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central from Jan 2008 to Nov 2025 in the chart:

India Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central
Unlimited access tailored to your data needs
Flexible monthly access to CEIC data