Colombia Construction Cost Index: Buildings: Dec2021=100

Construction Cost Index: Bldg: Apartments: Bogota & Cundinamarca

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Apartments: Bogota & Cundinamarca data was reported at 128.220 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.760 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Apartments: Bogota & Cundinamarca data is updated monthly, averaging 118.880 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 128.220 Dec2021=100 in Mar 2025 and a record low of 101.210 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Apartments: Bogota & Cundinamarca data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.310 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Apartments: Bogota & Cundinamarca from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Apartments: Bogota & Cundinamarca

Construction Cost Index: Bldg: Apartments: Bucaramanga

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Apartments: Bucaramanga data was reported at 125.620 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.170 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Apartments: Bucaramanga data is updated monthly, averaging 118.100 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.620 Dec2021=100 in Mar 2025 and a record low of 101.286 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Apartments: Bucaramanga data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.880 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Apartments: Bucaramanga from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Apartments: Bucaramanga

Construction Cost Index: Bldg: Apartments: Manizales

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Apartments: Manizales data was reported at 126.750 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.200 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Apartments: Manizales data is updated monthly, averaging 118.660 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.750 Dec2021=100 in Mar 2025 and a record low of 101.772 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Apartments: Manizales data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.980 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Apartments: Manizales from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Apartments: Manizales

Construction Cost Index: Bldg: Apartments: Valle del Aburra

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Apartments: Valle del Aburra data was reported at 126.570 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.890 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Apartments: Valle del Aburra data is updated monthly, averaging 118.730 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.570 Dec2021=100 in Mar 2025 and a record low of 101.772 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Apartments: Valle del Aburra data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.500 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Apartments: Valle del Aburra from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Apartments: Valle del Aburra

Construction Cost Index: Bldg: Apartments: Villavicencio

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Apartments: Villavicencio data was reported at 128.300 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.810 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Apartments: Villavicencio data is updated monthly, averaging 119.130 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 128.300 Dec2021=100 in Mar 2025 and a record low of 101.222 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Apartments: Villavicencio data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.300 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Apartments: Villavicencio from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Apartments: Villavicencio

Construction Cost Index: Bldg: Commerce: Montería

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Commerce: Montería data was reported at 102.866 Dec2021=100 in Feb 2022. This records an increase from the previous number of 102.020 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Commerce: Montería data is updated monthly, averaging 102.443 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.866 Dec2021=100 in Feb 2022 and a record low of 102.020 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Commerce: Montería data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.866 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Commerce: Montería from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Commerce: Montería

Construction Cost Index: Bldg: Commerce: Pasto

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Commerce: Pasto data was reported at 103.182 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.450 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Commerce: Pasto data is updated monthly, averaging 102.316 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.182 Dec2021=100 in Feb 2022 and a record low of 101.450 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Commerce: Pasto data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.182 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Commerce: Pasto from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Commerce: Pasto

Construction Cost Index: Bldg: Commerce: Santa Marta

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Commerce: Santa Marta data was reported at 103.140 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.843 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Commerce: Santa Marta data is updated monthly, averaging 102.492 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.140 Dec2021=100 in Feb 2022 and a record low of 101.843 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Commerce: Santa Marta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.140 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Commerce: Santa Marta from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Commerce: Santa Marta

Construction Cost Index: Bldg: Commerce: Valle del Aburra

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Commerce: Valle del Aburra data was reported at 103.067 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.758 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Commerce: Valle del Aburra data is updated monthly, averaging 102.412 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.067 Dec2021=100 in Feb 2022 and a record low of 101.758 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Commerce: Valle del Aburra data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.067 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Commerce: Valle del Aburra from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Commerce: Valle del Aburra

Construction Cost Index: Bldg: Commerce: Valledupar

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Commerce: Valledupar data was reported at 103.077 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.641 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Commerce: Valledupar data is updated monthly, averaging 102.359 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.077 Dec2021=100 in Feb 2022 and a record low of 101.641 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Commerce: Valledupar data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.077 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Commerce: Valledupar from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Commerce: Valledupar

Construction Cost Index: Bldg: Government: Barranquilla

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Government: Barranquilla data was reported at 102.643 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.555 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Government: Barranquilla data is updated monthly, averaging 102.099 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.643 Dec2021=100 in Feb 2022 and a record low of 101.555 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Government: Barranquilla data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.643 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Government: Barranquilla from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Government: Barranquilla

Construction Cost Index: Bldg: Government: Neiva

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Government: Neiva data was reported at 103.004 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.580 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Government: Neiva data is updated monthly, averaging 102.292 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.004 Dec2021=100 in Feb 2022 and a record low of 101.580 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Government: Neiva data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.004 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Government: Neiva from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Government: Neiva

Construction Cost Index: Bldg: Government: Santa Marta

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Government: Santa Marta data was reported at 102.499 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.488 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Government: Santa Marta data is updated monthly, averaging 101.993 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.499 Dec2021=100 in Feb 2022 and a record low of 101.488 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Government: Santa Marta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.499 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Government: Santa Marta from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Government: Santa Marta

Construction Cost Index: Bldg: Government: Tunja

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Government: Tunja data was reported at 103.450 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.133 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Government: Tunja data is updated monthly, averaging 102.291 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.450 Dec2021=100 in Feb 2022 and a record low of 101.133 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Government: Tunja data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.450 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Government: Tunja from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Government: Tunja

Construction Cost Index: Bldg: Government: Valle del Aburra

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Government: Valle del Aburra data was reported at 102.720 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.718 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Government: Valle del Aburra data is updated monthly, averaging 102.219 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.720 Dec2021=100 in Feb 2022 and a record low of 101.718 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Government: Valle del Aburra data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.720 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Government: Valle del Aburra from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Government: Valle del Aburra

Construction Cost Index: Bldg: Homes: Armenia

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Armenia data was reported at 126.130 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.470 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Armenia data is updated monthly, averaging 118.150 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.130 Dec2021=100 in Mar 2025 and a record low of 101.549 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Armenia data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.340 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Armenia from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Armenia

Construction Cost Index: Bldg: Homes: Barranquilla

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Barranquilla data was reported at 125.470 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.990 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Barranquilla data is updated monthly, averaging 117.490 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.470 Dec2021=100 in Mar 2025 and a record low of 101.394 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Barranquilla data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.580 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Barranquilla from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Barranquilla

Construction Cost Index: Bldg: Homes: Bucaramanga

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Bucaramanga data was reported at 125.440 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.930 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Bucaramanga data is updated monthly, averaging 117.410 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.440 Dec2021=100 in Mar 2025 and a record low of 101.284 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Bucaramanga data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.480 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Bucaramanga from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Bucaramanga

Construction Cost Index: Bldg: Homes: Ibague

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Ibague data was reported at 126.140 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.570 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Ibague data is updated monthly, averaging 118.240 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.140 Dec2021=100 in Mar 2025 and a record low of 102.079 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Ibague data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.340 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Ibague from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Ibague

Construction Cost Index: Bldg: Homes: Montería

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Montería data was reported at 127.390 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.750 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Montería data is updated monthly, averaging 119.150 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.390 Dec2021=100 in Mar 2025 and a record low of 102.023 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Montería data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.340 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Montería from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Montería

Construction Cost Index: Bldg: Homes: Neiva

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Neiva data was reported at 126.240 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.530 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Neiva data is updated monthly, averaging 117.980 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.240 Dec2021=100 in Mar 2025 and a record low of 101.953 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Neiva data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.350 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Neiva from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Neiva

Construction Cost Index: Bldg: Homes: Pasto

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Pasto data was reported at 125.540 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.010 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Pasto data is updated monthly, averaging 118.070 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.540 Dec2021=100 in Mar 2025 and a record low of 101.382 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Pasto data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.770 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Pasto from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Pasto

Construction Cost Index: Bldg: Homes: Popayan

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Popayan data was reported at 125.420 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.950 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Popayan data is updated monthly, averaging 118.050 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.420 Dec2021=100 in Mar 2025 and a record low of 101.372 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Popayan data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.700 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Popayan from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Popayan

Construction Cost Index: Bldg: Homes: Tunja

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Tunja data was reported at 127.440 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.320 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Tunja data is updated monthly, averaging 118.710 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.440 Dec2021=100 in Mar 2025 and a record low of 101.126 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Tunja data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.970 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Tunja from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Tunja

Construction Cost Index: Bldg: Homes: Valle del Aburra

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Valle del Aburra data was reported at 127.540 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.860 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Valle del Aburra data is updated monthly, averaging 119.370 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.540 Dec2021=100 in Mar 2025 and a record low of 101.763 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Valle del Aburra data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.380 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Valle del Aburra from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Valle del Aburra

Construction Cost Index: Bldg: Homes: Valledupar

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Valledupar data was reported at 126.300 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.820 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Valledupar data is updated monthly, averaging 118.320 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.300 Dec2021=100 in Mar 2025 and a record low of 101.576 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Valledupar data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.310 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Valledupar from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Valledupar

Construction Cost Index: Bldg: Homes: Villavicencio

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Homes: Villavicencio data was reported at 127.870 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.700 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Homes: Villavicencio data is updated monthly, averaging 119.010 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.870 Dec2021=100 in Mar 2025 and a record low of 101.223 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Homes: Villavicencio data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.210 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Homes: Villavicencio from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Homes: Villavicencio

Construction Cost Index: Bldg: Hospital & Care Center

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Hospital & Care Center data was reported at 128.830 Dec2021=100 in Mar 2025. This records an increase from the previous number of 127.840 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Hospital & Care Center data is updated monthly, averaging 120.270 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 128.830 Dec2021=100 in Mar 2025 and a record low of 101.775 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
126.610 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Hospital & Care Center from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Hospital & Care Center

Construction Cost Index: Bldg: Hospital & Care Center: Barranquilla

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Hospital & Care Center: Barranquilla data was reported at 103.126 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.752 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Barranquilla data is updated monthly, averaging 102.439 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.126 Dec2021=100 in Feb 2022 and a record low of 101.752 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Barranquilla data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.126 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Hospital & Care Center: Barranquilla from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Hospital & Care Center: Barranquilla

Construction Cost Index: Bldg: Hospital & Care Center: Bucaramanga

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Hospital & Care Center: Bucaramanga data was reported at 103.044 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.681 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Bucaramanga data is updated monthly, averaging 102.362 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.044 Dec2021=100 in Feb 2022 and a record low of 101.681 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Bucaramanga data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.044 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Hospital & Care Center: Bucaramanga from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Hospital & Care Center: Bucaramanga

Construction Cost Index: Bldg: Hospital & Care Center: Cali

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Hospital & Care Center: Cali data was reported at 103.738 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.911 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Cali data is updated monthly, averaging 102.825 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.738 Dec2021=100 in Feb 2022 and a record low of 101.911 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Cali data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.738 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Hospital & Care Center: Cali from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Hospital & Care Center: Cali

Construction Cost Index: Bldg: Hospital & Care Center: Centro Occidente

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Hospital & Care Center: Centro Occidente data was reported at 103.583 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.856 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Centro Occidente data is updated monthly, averaging 102.719 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.583 Dec2021=100 in Feb 2022 and a record low of 101.856 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Centro Occidente data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.583 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Hospital & Care Center: Centro Occidente from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Hospital & Care Center: Centro Occidente

Construction Cost Index: Bldg: Hospital & Care Center: Ibague

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Hospital & Care Center: Ibague data was reported at 103.799 Dec2021=100 in Feb 2022. This records an increase from the previous number of 102.042 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Ibague data is updated monthly, averaging 102.921 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.799 Dec2021=100 in Feb 2022 and a record low of 102.042 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Hospital & Care Center: Ibague data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.799 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Hospital & Care Center: Ibague from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Hospital & Care Center: Ibague

Construction Cost Index: Bldg: Non Residential: Armenia

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Non Residential: Armenia data was reported at 126.360 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.710 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Non Residential: Armenia data is updated monthly, averaging 118.740 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.360 Dec2021=100 in Mar 2025 and a record low of 101.452 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Non Residential: Armenia data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.400 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Non Residential: Armenia from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Non Residential: Armenia

Construction Cost Index: Bldg: Non Residential: Bucaramanga

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Non Residential: Bucaramanga data was reported at 127.170 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.700 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Non Residential: Bucaramanga data is updated monthly, averaging 119.100 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.170 Dec2021=100 in Mar 2025 and a record low of 101.365 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Non Residential: Bucaramanga data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.220 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Non Residential: Bucaramanga from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Non Residential: Bucaramanga

Construction Cost Index: Bldg: Non Residential: Cucuta

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Non Residential: Cucuta data was reported at 127.670 Dec2021=100 in Mar 2025. This records an increase from the previous number of 127.180 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Non Residential: Cucuta data is updated monthly, averaging 119.110 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.670 Dec2021=100 in Mar 2025 and a record low of 101.390 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Non Residential: Cucuta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.700 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Non Residential: Cucuta from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Non Residential: Cucuta

Construction Cost Index: Bldg: Non Residential: Neiva

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Non Residential: Neiva data was reported at 128.030 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.620 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Non Residential: Neiva data is updated monthly, averaging 118.750 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 128.030 Dec2021=100 in Mar 2025 and a record low of 101.826 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Non Residential: Neiva data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.470 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Non Residential: Neiva from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Non Residential: Neiva

Construction Cost Index: Bldg: Non Residential: Santa Marta

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Non Residential: Santa Marta data was reported at 126.720 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.230 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Non Residential: Santa Marta data is updated monthly, averaging 118.440 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.720 Dec2021=100 in Mar 2025 and a record low of 101.709 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Non Residential: Santa Marta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.710 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Non Residential: Santa Marta from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Non Residential: Santa Marta

Construction Cost Index: Bldg: Non Residential: Valle del Aburra

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Non Residential: Valle del Aburra data was reported at 127.450 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.780 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Non Residential: Valle del Aburra data is updated monthly, averaging 119.330 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.450 Dec2021=100 in Mar 2025 and a record low of 101.763 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Non Residential: Valle del Aburra data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.190 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Non Residential: Valle del Aburra from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Non Residential: Valle del Aburra

Construction Cost Index: Bldg: Offices

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices data was reported at 127.800 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.760 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Offices data is updated monthly, averaging 119.410 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.800 Dec2021=100 in Mar 2025 and a record low of 101.449 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.430 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Offices from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Offices

Construction Cost Index: Bldg: Offices: Cartagena

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Cartagena data was reported at 103.561 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.634 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Cartagena data is updated monthly, averaging 102.597 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.561 Dec2021=100 in Feb 2022 and a record low of 101.634 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Cartagena data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.561 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Cartagena from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Cartagena

Construction Cost Index: Bldg: Offices: Centro Occidente

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Centro Occidente data was reported at 102.744 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.127 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Centro Occidente data is updated monthly, averaging 101.935 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.744 Dec2021=100 in Feb 2022 and a record low of 101.127 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Centro Occidente data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.744 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Centro Occidente from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Centro Occidente

Construction Cost Index: Bldg: Offices: Cucuta

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Cucuta data was reported at 102.861 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.454 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Cucuta data is updated monthly, averaging 102.157 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.861 Dec2021=100 in Feb 2022 and a record low of 101.454 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Cucuta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.861 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Cucuta from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Cucuta

Construction Cost Index: Bldg: Offices: Ibague

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Ibague data was reported at 102.333 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.304 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Ibague data is updated monthly, averaging 101.819 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.333 Dec2021=100 in Feb 2022 and a record low of 101.304 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Ibague data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.333 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Ibague from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Ibague

Construction Cost Index: Bldg: Offices: Manizales

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Manizales data was reported at 103.308 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.914 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Manizales data is updated monthly, averaging 102.611 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.308 Dec2021=100 in Feb 2022 and a record low of 101.914 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Manizales data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.308 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Manizales from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Manizales

Construction Cost Index: Bldg: Offices: Pasto

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Pasto data was reported at 103.224 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.440 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Pasto data is updated monthly, averaging 102.332 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.224 Dec2021=100 in Feb 2022 and a record low of 101.440 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Pasto data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.224 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Pasto from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Pasto

Construction Cost Index: Bldg: Offices: Santa Marta

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Santa Marta data was reported at 103.227 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.772 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Santa Marta data is updated monthly, averaging 102.500 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.227 Dec2021=100 in Feb 2022 and a record low of 101.772 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Santa Marta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.227 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Santa Marta from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Santa Marta

Construction Cost Index: Bldg: Offices: Valle del Aburra

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Valle del Aburra data was reported at 103.045 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.582 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Valle del Aburra data is updated monthly, averaging 102.314 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.045 Dec2021=100 in Feb 2022 and a record low of 101.582 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Valle del Aburra data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.045 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Valle del Aburra from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Valle del Aburra

Construction Cost Index: Bldg: Offices: Valledupar

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Valledupar data was reported at 103.019 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.619 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Valledupar data is updated monthly, averaging 102.319 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.019 Dec2021=100 in Feb 2022 and a record low of 101.619 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Valledupar data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.019 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Valledupar from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Valledupar

Construction Cost Index: Bldg: Offices: Villavicencio

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Offices: Villavicencio data was reported at 103.815 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.425 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Offices: Villavicencio data is updated monthly, averaging 102.620 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.815 Dec2021=100 in Feb 2022 and a record low of 101.425 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Offices: Villavicencio data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.815 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Offices: Villavicencio from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Offices: Villavicencio

Construction Cost Index: Bldg: Others

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Others data was reported at 129.030 Dec2021=100 in Mar 2025. This records an increase from the previous number of 128.020 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Others data is updated monthly, averaging 120.090 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 129.030 Dec2021=100 in Mar 2025 and a record low of 101.438 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Others data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
126.650 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Others from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Others

Construction Cost Index: Bldg: Others: Barranquilla

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Others: Barranquilla data was reported at 103.197 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.479 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Others: Barranquilla data is updated monthly, averaging 102.338 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.197 Dec2021=100 in Feb 2022 and a record low of 101.479 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Others: Barranquilla data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.197 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Others: Barranquilla from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Others: Barranquilla

Construction Cost Index: Bldg: Others: Bogota & Cundinamarca

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Others: Bogota & Cundinamarca data was reported at 103.558 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.194 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Others: Bogota & Cundinamarca data is updated monthly, averaging 102.376 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.558 Dec2021=100 in Feb 2022 and a record low of 101.194 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Others: Bogota & Cundinamarca data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.558 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Others: Bogota & Cundinamarca from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Others: Bogota & Cundinamarca

Construction Cost Index: Bldg: Others: Cucuta

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Others: Cucuta data was reported at 102.842 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.339 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Others: Cucuta data is updated monthly, averaging 102.090 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.842 Dec2021=100 in Feb 2022 and a record low of 101.339 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Others: Cucuta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.842 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Others: Cucuta from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Others: Cucuta

Construction Cost Index: Bldg: Others: Ibague

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Others: Ibague data was reported at 103.629 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.784 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Others: Ibague data is updated monthly, averaging 102.707 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.629 Dec2021=100 in Feb 2022 and a record low of 101.784 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Others: Ibague data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.629 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Others: Ibague from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Others: Ibague

Construction Cost Index: Bldg: Others: Montería

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Others: Montería data was reported at 103.286 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.794 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Others: Montería data is updated monthly, averaging 102.540 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.286 Dec2021=100 in Feb 2022 and a record low of 101.794 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Others: Montería data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.286 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Others: Montería from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Others: Montería

Construction Cost Index: Bldg: Pasto

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Pasto data was reported at 125.560 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.030 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Pasto data is updated monthly, averaging 118.260 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.560 Dec2021=100 in Mar 2025 and a record low of 101.396 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Pasto data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.820 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Pasto from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Pasto

Construction Cost Index: Bldg: Residential

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Residential data was reported at 126.870 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.940 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Residential data is updated monthly, averaging 118.470 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.870 Dec2021=100 in Mar 2025 and a record low of 101.442 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Residential data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.580 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Residential from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Residential

Construction Cost Index: Bldg: Residential: Barranquilla

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Residential: Barranquilla data was reported at 125.020 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.530 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Residential: Barranquilla data is updated monthly, averaging 117.290 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.020 Dec2021=100 in Mar 2025 and a record low of 101.455 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Residential: Barranquilla data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.250 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Residential: Barranquilla from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Residential: Barranquilla

Construction Cost Index: Bldg: Residential: Bogota & Cundinamarca

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Residential: Bogota & Cundinamarca data was reported at 128.160 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.740 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Residential: Bogota & Cundinamarca data is updated monthly, averaging 118.880 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 128.160 Dec2021=100 in Mar 2025 and a record low of 101.204 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Residential: Bogota & Cundinamarca data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.290 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Residential: Bogota & Cundinamarca from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Residential: Bogota & Cundinamarca

Construction Cost Index: Bldg: Residential: Bucaramanga

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Residential: Bucaramanga data was reported at 125.600 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.140 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Residential: Bucaramanga data is updated monthly, averaging 118.040 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.600 Dec2021=100 in Mar 2025 and a record low of 101.286 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Residential: Bucaramanga data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.830 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Residential: Bucaramanga from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Residential: Bucaramanga

Construction Cost Index: Bldg: Residential: Ibague

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Residential: Ibague data was reported at 125.510 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.820 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Residential: Ibague data is updated monthly, averaging 117.330 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.510 Dec2021=100 in Mar 2025 and a record low of 101.792 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Residential: Ibague data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.670 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Residential: Ibague from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Residential: Ibague

Construction Cost Index: Bldg: Residential: Manizales

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Residential: Manizales data was reported at 126.890 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.350 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Residential: Manizales data is updated monthly, averaging 118.690 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.890 Dec2021=100 in Mar 2025 and a record low of 101.768 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Residential: Manizales data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.100 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Residential: Manizales from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Residential: Manizales

Construction Cost Index: Bldg: Residential: Villavicencio

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Residential: Villavicencio data was reported at 128.100 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.760 Dec2021=100 for Feb 2025. Construction Cost Index: Bldg: Residential: Villavicencio data is updated monthly, averaging 119.120 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 128.100 Dec2021=100 in Mar 2025 and a record low of 101.222 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Residential: Villavicencio data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.250 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Bldg: Residential: Villavicencio from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Bldg: Residential: Villavicencio

Construction Cost Index: Bldg: Warehouse: Armenia

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Armenia data was reported at 103.260 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.383 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Armenia data is updated monthly, averaging 102.322 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.260 Dec2021=100 in Feb 2022 and a record low of 101.383 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Armenia data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.260 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Armenia from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Armenia

Construction Cost Index: Bldg: Warehouse: Montería

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Montería data was reported at 103.505 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.734 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Montería data is updated monthly, averaging 102.619 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.505 Dec2021=100 in Feb 2022 and a record low of 101.734 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Montería data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.505 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Montería from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Montería

Construction Cost Index: Bldg: Warehouse: Neiva

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Neiva data was reported at 103.361 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.428 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Neiva data is updated monthly, averaging 102.394 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.361 Dec2021=100 in Feb 2022 and a record low of 101.428 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Neiva data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.361 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Neiva from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Neiva

Construction Cost Index: Bldg: Warehouse: Pasto

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Pasto data was reported at 103.415 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.348 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Pasto data is updated monthly, averaging 102.382 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.415 Dec2021=100 in Feb 2022 and a record low of 101.348 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Pasto data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.415 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Pasto from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Pasto

Construction Cost Index: Bldg: Warehouse: Popayan

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Popayan data was reported at 103.449 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.371 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Popayan data is updated monthly, averaging 102.410 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.449 Dec2021=100 in Feb 2022 and a record low of 101.371 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Popayan data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.449 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Popayan from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Popayan

Construction Cost Index: Bldg: Warehouse: Santa Marta

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Santa Marta data was reported at 102.981 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.442 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Santa Marta data is updated monthly, averaging 102.212 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.981 Dec2021=100 in Feb 2022 and a record low of 101.442 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Santa Marta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.981 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Santa Marta from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Santa Marta

Construction Cost Index: Bldg: Warehouse: Tunja

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Tunja data was reported at 103.729 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.130 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Tunja data is updated monthly, averaging 102.429 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.729 Dec2021=100 in Feb 2022 and a record low of 101.130 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Tunja data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.729 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Tunja from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Tunja

Construction Cost Index: Bldg: Warehouse: Valle del Aburra

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Valle del Aburra data was reported at 103.465 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.540 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Valle del Aburra data is updated monthly, averaging 102.502 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.465 Dec2021=100 in Feb 2022 and a record low of 101.540 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Valle del Aburra data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.465 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Valle del Aburra from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Valle del Aburra

Construction Cost Index: Bldg: Warehouse: Valledupar

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Valledupar data was reported at 103.125 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.317 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Valledupar data is updated monthly, averaging 102.221 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.125 Dec2021=100 in Feb 2022 and a record low of 101.317 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Valledupar data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.125 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Valledupar from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Valledupar

Construction Cost Index: Bldg: Warehouse: Villavicencio

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Bldg: Warehouse: Villavicencio data was reported at 103.715 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.121 Dec2021=100 for Jan 2022. Construction Cost Index: Bldg: Warehouse: Villavicencio data is updated monthly, averaging 102.418 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.715 Dec2021=100 in Feb 2022 and a record low of 101.121 Dec2021=100 in Jan 2022. Construction Cost Index: Bldg: Warehouse: Villavicencio data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.715 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Bldg: Warehouse: Villavicencio from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Bldg: Warehouse: Villavicencio

Construction Cost Index: Buildings: Apartments

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments data was reported at 126.910 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.950 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments data is updated monthly, averaging 118.470 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.910 Dec2021=100 in Mar 2025 and a record low of 101.441 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.590 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments

Construction Cost Index: Buildings: Apartments: Armenia

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Armenia data was reported at 125.240 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.670 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Armenia data is updated monthly, averaging 117.710 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.240 Dec2021=100 in Mar 2025 and a record low of 101.453 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Armenia data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.530 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Armenia from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Armenia

Construction Cost Index: Buildings: Apartments: Barranquilla

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Barranquilla data was reported at 124.960 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.470 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Barranquilla data is updated monthly, averaging 117.270 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 124.960 Dec2021=100 in Mar 2025 and a record low of 101.463 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Barranquilla data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.210 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Barranquilla from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Barranquilla

Construction Cost Index: Buildings: Apartments: Cali

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Cali data was reported at 125.840 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.320 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Cali data is updated monthly, averaging 118.390 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.840 Dec2021=100 in Mar 2025 and a record low of 101.529 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Cali data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.090 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Cali from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Cali

Construction Cost Index: Buildings: Apartments: Cartagena

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Cartagena data was reported at 126.180 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.410 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Cartagena data is updated monthly, averaging 118.100 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.180 Dec2021=100 in Mar 2025 and a record low of 101.594 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Cartagena data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.160 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Cartagena from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Cartagena

Construction Cost Index: Buildings: Apartments: Centro Occidente

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Centro Occidente data was reported at 125.670 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.010 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Centro Occidente data is updated monthly, averaging 117.900 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.670 Dec2021=100 in Mar 2025 and a record low of 101.500 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Centro Occidente data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.840 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Centro Occidente from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Centro Occidente

Construction Cost Index: Buildings: Apartments: Cúcuta

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Cúcuta data was reported at 126.370 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.910 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Cúcuta data is updated monthly, averaging 117.870 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.370 Dec2021=100 in Mar 2025 and a record low of 101.118 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Cúcuta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.530 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Cúcuta from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Cúcuta

Construction Cost Index: Buildings: Apartments: Ibagué

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Ibagué data was reported at 125.460 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.750 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Ibagué data is updated monthly, averaging 117.300 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.460 Dec2021=100 in Mar 2025 and a record low of 101.767 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Ibagué data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.610 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Ibagué from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Ibagué

Construction Cost Index: Buildings: Apartments: Montería

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Montería data was reported at 126.000 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.350 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Montería data is updated monthly, averaging 118.620 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.000 Dec2021=100 in Mar 2025 and a record low of 101.833 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Montería data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.030 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Montería from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Montería

Construction Cost Index: Buildings: Apartments: Pasto

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Pasto data was reported at 125.180 Dec2021=100 in Mar 2025. This records an increase from the previous number of 124.680 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Pasto data is updated monthly, averaging 117.990 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.180 Dec2021=100 in Mar 2025 and a record low of 101.373 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Pasto data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.490 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Pasto from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Pasto

Construction Cost Index: Buildings: Apartments: Santa Marta

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Santa Marta data was reported at 125.540 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.080 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Santa Marta data is updated monthly, averaging 117.670 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.540 Dec2021=100 in Mar 2025 and a record low of 101.699 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Santa Marta data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.760 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Santa Marta from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Santa Marta

Construction Cost Index: Buildings: Apartments: Tunja

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Apartments: Tunja data was reported at 127.810 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.320 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Apartments: Tunja data is updated monthly, averaging 118.970 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 127.810 Dec2021=100 in Mar 2025 and a record low of 101.281 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Apartments: Tunja data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
125.070 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Apartments: Tunja from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Apartments: Tunja

Construction Cost Index: Buildings: Armenia

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Armenia data was reported at 125.640 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.040 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Armenia data is updated monthly, averaging 118.010 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.640 Dec2021=100 in Mar 2025 and a record low of 101.463 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Armenia data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.860 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Armenia from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Armenia

Construction Cost Index: Buildings: Barranquilla

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Barranquilla data was reported at 125.700 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.220 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Barranquilla data is updated monthly, averaging 117.850 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 125.700 Dec2021=100 in Mar 2025 and a record low of 101.505 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Barranquilla data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
123.890 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Barranquilla from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Barranquilla

Construction Cost Index: Buildings: Bucaramanga

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Bucaramanga data was reported at 126.020 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.560 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Bucaramanga data is updated monthly, averaging 118.330 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.020 Dec2021=100 in Mar 2025 and a record low of 101.307 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Bucaramanga data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.210 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Bucaramanga from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Bucaramanga

Construction Cost Index: Buildings: Cartagena

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Cartagena data was reported at 126.770 Dec2021=100 in Mar 2025. This records an increase from the previous number of 126.040 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Cartagena data is updated monthly, averaging 118.600 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.770 Dec2021=100 in Mar 2025 and a record low of 101.637 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Cartagena data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.730 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Cartagena from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Cartagena

Construction Cost Index: Buildings: Centro Occidente

2022 - 2025 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Centro Occidente data was reported at 126.020 Dec2021=100 in Mar 2025. This records an increase from the previous number of 125.340 Dec2021=100 for Feb 2025. Construction Cost Index: Buildings: Centro Occidente data is updated monthly, averaging 118.260 Dec2021=100 from Jan 2022 (Median) to Mar 2025, with 39 observations. The data reached an all-time high of 126.020 Dec2021=100 in Mar 2025 and a record low of 101.526 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Centro Occidente data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
124.170 Jan 2025 monthly Jan 2022 - Jan 2025

View Colombia's Construction Cost Index: Buildings: Centro Occidente from Jan 2022 to Jan 2025 in the chart:

Colombia Construction Cost Index: Buildings: Centro Occidente

Construction Cost Index: Buildings: Commerce: Armenia

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Commerce: Armenia data was reported at 102.755 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.353 Dec2021=100 for Jan 2022. Construction Cost Index: Buildings: Commerce: Armenia data is updated monthly, averaging 102.054 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.755 Dec2021=100 in Feb 2022 and a record low of 101.353 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Commerce: Armenia data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.755 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Buildings: Commerce: Armenia from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Buildings: Commerce: Armenia

Construction Cost Index: Buildings: Commerce: Barranquilla

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Commerce: Barranquilla data was reported at 102.994 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.736 Dec2021=100 for Jan 2022. Construction Cost Index: Buildings: Commerce: Barranquilla data is updated monthly, averaging 102.365 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.994 Dec2021=100 in Feb 2022 and a record low of 101.736 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Commerce: Barranquilla data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.994 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Buildings: Commerce: Barranquilla from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Buildings: Commerce: Barranquilla

Construction Cost Index: Buildings: Commerce: Bucaramanga

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Commerce: Bucaramanga data was reported at 102.611 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.398 Dec2021=100 for Jan 2022. Construction Cost Index: Buildings: Commerce: Bucaramanga data is updated monthly, averaging 102.005 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 102.611 Dec2021=100 in Feb 2022 and a record low of 101.398 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Commerce: Bucaramanga data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
102.611 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Buildings: Commerce: Bucaramanga from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Buildings: Commerce: Bucaramanga

Construction Cost Index: Buildings: Commerce: Cali

2022 - 2022 | Monthly | Dec2021=100 | National Administrative Department of Statistics

Construction Cost Index: Buildings: Commerce: Cali data was reported at 103.374 Dec2021=100 in Feb 2022. This records an increase from the previous number of 101.707 Dec2021=100 for Jan 2022. Construction Cost Index: Buildings: Commerce: Cali data is updated monthly, averaging 102.540 Dec2021=100 from Jan 2022 (Median) to Feb 2022, with 2 observations. The data reached an all-time high of 103.374 Dec2021=100 in Feb 2022 and a record low of 101.707 Dec2021=100 in Jan 2022. Construction Cost Index: Buildings: Commerce: Cali data remains active status in CEIC and is reported by National Administrative Department of Statistics. The data is categorized under Global Database’s Colombia – Table CO.EA007: Construction Cost Index: Buildings: Dec2021=100.

Last Frequency Range
103.374 Feb 2022 monthly Jan 2022 - Feb 2022

View Colombia's Construction Cost Index: Buildings: Commerce: Cali from Jan 2022 to Feb 2022 in the chart:

Colombia Construction Cost Index: Buildings: Commerce: Cali