Brazil Electrical Energy: Extension Transmission Line

Extension of the Basic Transmission Grid: 132 Kv

1999 - 2022 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 132 Kv data was reported at 12.500 km in Oct 2022. This stayed constant from the previous number of 12.500 km for Sep 2022. Extension of the Basic Transmission Grid: 132 Kv data is updated monthly, averaging 12.500 km from Jan 1999 (Median) to Oct 2022, with 286 observations. The data reached an all-time high of 12.500 km in Oct 2022 and a record low of 12.500 km in Oct 2022. Extension of the Basic Transmission Grid: 132 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
12.500 Oct 2022 monthly Jan 1999 - Oct 2022

View Brazil's Extension of the Basic Transmission Grid: 132 Kv from Jan 1999 to Oct 2022 in the chart:

Brazil Extension of the Basic Transmission Grid: 132 Kv

Extension of the Basic Transmission Grid: 138 Kv

2009 - 2023 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 138 Kv data was reported at 115.460 km in Dec 2023. This stayed constant from the previous number of 115.460 km for Nov 2023. Extension of the Basic Transmission Grid: 138 Kv data is updated monthly, averaging 115.460 km from Jan 2009 (Median) to Dec 2023, with 180 observations. The data reached an all-time high of 115.460 km in Dec 2023 and a record low of 30.000 km in Aug 2019. Extension of the Basic Transmission Grid: 138 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
115.460 Dec 2023 monthly Jan 2009 - Dec 2023

View Brazil's Extension of the Basic Transmission Grid: 138 Kv from Jan 2009 to Dec 2023 in the chart:

Brazil Extension of the Basic Transmission Grid: 138 Kv

Extension of the Basic Transmission Grid: 230 Kv

1999 - 2025 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 230 Kv data was reported at 66,438.074 km in Apr 2025. This records a decrease from the previous number of 66,580.174 km for Mar 2025. Extension of the Basic Transmission Grid: 230 Kv data is updated monthly, averaging 43,293.421 km from Jan 1999 (Median) to Apr 2025, with 316 observations. The data reached an all-time high of 66,602.654 km in Jan 2025 and a record low of 28,760.142 km in Jan 1999. Extension of the Basic Transmission Grid: 230 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
66,220.634 Feb 2025 monthly Jan 1999 - Feb 2025

View Brazil's Extension of the Basic Transmission Grid: 230 Kv from Jan 1999 to Feb 2025 in the chart:

Brazil Extension of the Basic Transmission Grid: 230 Kv

Extension of the Basic Transmission Grid: 345 Kv

1999 - 2025 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 345 Kv data was reported at 10,820.787 km in Apr 2025. This records an increase from the previous number of 10,802.817 km for Mar 2025. Extension of the Basic Transmission Grid: 345 Kv data is updated monthly, averaging 9,245.508 km from Jan 1999 (Median) to Apr 2025, with 316 observations. The data reached an all-time high of 10,820.787 km in Apr 2025 and a record low of 7,928.327 km in Jan 1999. Extension of the Basic Transmission Grid: 345 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
10,802.817 Feb 2025 monthly Jan 1999 - Feb 2025

View Brazil's Extension of the Basic Transmission Grid: 345 Kv from Jan 1999 to Feb 2025 in the chart:

Brazil Extension of the Basic Transmission Grid: 345 Kv

Extension of the Basic Transmission Grid: 440 Kv

1999 - 2025 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 440 Kv data was reported at 7,071.520 km in Apr 2025. This stayed constant from the previous number of 7,071.520 km for Mar 2025. Extension of the Basic Transmission Grid: 440 Kv data is updated monthly, averaging 6,846.330 km from Jan 1999 (Median) to Apr 2025, with 316 observations. The data reached an all-time high of 7,071.520 km in Apr 2025 and a record low of 6,185.660 km in Jul 2000. Extension of the Basic Transmission Grid: 440 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
7,071.520 Feb 2025 monthly Jan 1999 - Feb 2025

View Brazil's Extension of the Basic Transmission Grid: 440 Kv from Jan 1999 to Feb 2025 in the chart:

Brazil Extension of the Basic Transmission Grid: 440 Kv

Extension of the Basic Transmission Grid: 500 Kv

1999 - 2025 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 500 Kv data was reported at 60,967.207 km in Apr 2025. This records an increase from the previous number of 60,425.207 km for Mar 2025. Extension of the Basic Transmission Grid: 500 Kv data is updated monthly, averaging 28,828.241 km from Jan 1999 (Median) to Apr 2025, with 316 observations. The data reached an all-time high of 60,967.207 km in Apr 2025 and a record low of 10,864.648 km in Feb 1999. Extension of the Basic Transmission Grid: 500 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
60,427.897 Feb 2025 monthly Jan 1999 - Feb 2025

View Brazil's Extension of the Basic Transmission Grid: 500 Kv from Jan 1999 to Feb 2025 in the chart:

Brazil Extension of the Basic Transmission Grid: 500 Kv

Extension of the Basic Transmission Grid: 525 Kv

1999 - 2025 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 525 Kv data was reported at 10,855.190 km in Apr 2025. This stayed constant from the previous number of 10,855.190 km for Mar 2025. Extension of the Basic Transmission Grid: 525 Kv data is updated monthly, averaging 5,027.850 km from Jan 1999 (Median) to Apr 2025, with 316 observations. The data reached an all-time high of 10,855.190 km in Apr 2025 and a record low of 2,284.900 km in Jan 1999. Extension of the Basic Transmission Grid: 525 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
10,855.190 Feb 2025 monthly Jan 1999 - Feb 2025

View Brazil's Extension of the Basic Transmission Grid: 525 Kv from Jan 1999 to Feb 2025 in the chart:

Brazil Extension of the Basic Transmission Grid: 525 Kv

Extension of the Basic Transmission Grid: 600 Kv

2013 - 2025 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 600 Kv data was reported at 9,544.000 km in Apr 2025. This stayed constant from the previous number of 9,544.000 km for Mar 2025. Extension of the Basic Transmission Grid: 600 Kv data is updated monthly, averaging 9,544.000 km from Nov 2013 (Median) to Apr 2025, with 138 observations. The data reached an all-time high of 9,544.000 km in Apr 2025 and a record low of 4,772.000 km in May 2015. Extension of the Basic Transmission Grid: 600 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
9,544.000 Feb 2025 monthly Nov 2013 - Feb 2025

View Brazil's Extension of the Basic Transmission Grid: 600 Kv from Nov 2013 to Feb 2025 in the chart:

Brazil Extension of the Basic Transmission Grid: 600 Kv

Extension of the Basic Transmission Grid: 765 Kv

1999 - 2025 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 765 Kv data was reported at 1,722.000 km in Apr 2025. This stayed constant from the previous number of 1,722.000 km for Mar 2025. Extension of the Basic Transmission Grid: 765 Kv data is updated monthly, averaging 1,722.000 km from Jan 1999 (Median) to Apr 2025, with 316 observations. The data reached an all-time high of 1,722.000 km in Apr 2025 and a record low of 1,138.000 km in Apr 2000. Extension of the Basic Transmission Grid: 765 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
1,722.000 Feb 2025 monthly Jan 1999 - Feb 2025

View Brazil's Extension of the Basic Transmission Grid: 765 Kv from Jan 1999 to Feb 2025 in the chart:

Brazil Extension of the Basic Transmission Grid: 765 Kv

Extension of the Basic Transmission Grid: 800 Kv

2017 - 2025 | Monthly | km | National Electric System Operator

Extension of the Basic Transmission Grid: 800 Kv data was reported at 9,204.000 km in Apr 2025. This stayed constant from the previous number of 9,204.000 km for Mar 2025. Extension of the Basic Transmission Grid: 800 Kv data is updated monthly, averaging 9,204.000 km from Dec 2017 (Median) to Apr 2025, with 89 observations. The data reached an all-time high of 9,204.000 km in Apr 2025 and a record low of 4,168.000 km in Jul 2019. Extension of the Basic Transmission Grid: 800 Kv data remains active status in CEIC and is reported by National Electric System Operator. The data is categorized under Brazil Premium Database’s Energy Sector – Table BR.RBA013: Electrical Energy: Extension Transmission Line.

Last Frequency Range
9,204.000 Feb 2025 monthly Dec 2017 - Feb 2025

View Brazil's Extension of the Basic Transmission Grid: 800 Kv from Dec 2017 to Feb 2025 in the chart:

Brazil Extension of the Basic Transmission Grid: 800 Kv
Unlimited access tailored to your data needs