印度 Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear
Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central在2025-11达127.270MW,相较于2025-10的127.270MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central数据按月度更新,2008-01至2025-11期间平均值为127.160MW,共215份观测结果。该数据的历史最高值出现于2015-01,达275.780MW,而历史最低值则出现于2009-08,为37.410MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 127.270 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Andhra Pradesh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central在2025-11达10.409MW,相较于2025-10的10.409MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central数据按月度更新,2008-01至2025-11期间平均值为8.840MW,共215份观测结果。该数据的历史最高值出现于2025-11,达10.409MW,而历史最低值则出现于2010-01,为4.840MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 10.409 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Chandigarh: Central
Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi
Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi在2025-11达153.382MW,相较于2025-10的153.382MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi数据按月度更新,2008-01至2025-11期间平均值为122.080MW,共215份观测结果。该数据的历史最高值出现于2025-11,达153.382MW,而历史最低值则出现于2010-01,为47.080MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 153.382 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: NCT of Delhi
Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central
Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central在2025-11达123.042MW,相较于2025-10的123.042MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central数据按月度更新,2008-01至2025-11期间平均值为109.160MW,共215份观测结果。该数据的历史最高值出现于2025-11,达123.042MW,而历史最低值则出现于2010-01,为76.160MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 123.042 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Haryana: Central
Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh
Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh在2025-11达42.224MW,相较于2025-10的42.224MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh数据按月度更新,2008-01至2025-11期间平均值为34.080MW,共215份观测结果。该数据的历史最高值出现于2025-11,达42.224MW,而历史最低值则出现于2010-01,为14.080MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 42.224 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Himachal Pradesh
Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir
Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir在2025-11达95.126MW,相较于2025-10的95.126MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir数据按月度更新,2008-01至2025-11期间平均值为77.000MW,共215份观测结果。该数据的历史最高值出现于2025-11,达95.126MW,而历史最低值则出现于2025-03,为67.980MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 95.126 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Jammu and Kashmir
Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra
Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra在2025-11达1,068.660MW,相较于2025-10的1,068.660MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra数据按月度更新,2008-01至2025-11期间平均值为690.140MW,共215份观测结果。该数据的历史最高值出现于2025-11,达1,068.660MW,而历史最低值则出现于2023-05,为690.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 1,068.660 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra
Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central
Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central在2025-11达1,068.660MW,相较于2025-10的1,068.660MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central数据按月度更新,2008-01至2025-11期间平均值为690.140MW,共215份观测结果。该数据的历史最高值出现于2025-11,达1,068.660MW,而历史最低值则出现于2023-05,为690.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 1,068.660 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Maharashtra: Central
Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central
Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central在2025-11达86.000MW,相较于2025-10的86.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central数据按月度更新,2008-01至2025-11期间平均值为52.780MW,共215份观测结果。该数据的历史最高值出现于2025-11,达86.000MW,而历史最低值则出现于2010-12,为16.280MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 86.000 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Puducherry: Central
Electricity: Installed Capacity: Utilities: Nuclear: Punjab
Electricity: Installed Capacity: Utilities: Nuclear: Punjab在2025-11达229.089MW,相较于2025-10的229.089MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Punjab数据按月度更新,2008-01至2025-11期间平均值为208.040MW,共215份观测结果。该数据的历史最高值出现于2025-11,达229.089MW,而历史最低值则出现于2010-01,为151.040MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Punjab数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 229.089 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Punjab
Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan
Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan在2025-11达806.740MW,相较于2025-10的806.740MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan数据按月度更新,2008-01至2025-11期间平均值为573.000MW,共215份观测结果。该数据的历史最高值出现于2025-11,达806.740MW,而历史最低值则出现于2010-01,为469.000MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 806.740 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Rajasthan
Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central
Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central在2025-11达1,448.000MW,相较于2025-10的1,448.000MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central数据按月度更新,2008-01至2025-11期间平均值为986.500MW,共215份观测结果。该数据的历史最高值出现于2025-11,达1,448.000MW,而历史最低值则出现于2010-12,为478.500MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 1,448.000 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Tamil Nadu: Central
Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central
Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central在2025-11达148.730MW,相较于2025-10的148.730MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central数据按月度更新,2015-02至2025-11期间平均值为148.730MW,共130份观测结果。该数据的历史最高值出现于2025-11,达148.730MW,而历史最低值则出现于2017-02,为148.620MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 148.730 2025-11 | 月度 | 2015-02 - 2025-11 |
查看图表中 2015-02 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Telangana: Central
Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central在2025-11达370.452MW,相较于2025-10的370.452MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central数据按月度更新,2008-01至2025-11期间平均值为335.720MW,共215份观测结果。该数据的历史最高值出现于2025-11,达370.452MW,而历史最低值则出现于2010-01,为203.720MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 370.452 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Uttar Pradesh: Central
Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand
Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand在2025-11达47.508MW,相较于2025-10的47.508MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand数据按月度更新,2008-01至2025-11期间平均值为22.280MW,共215份观测结果。该数据的历史最高值出现于2025-11,达47.508MW,而历史最低值则出现于2010-01,为16.280MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 47.508 2025-11 | 月度 | 2008-01 - 2025-11 |
查看图表中 2008-01 到2025-11 期间的India Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand
Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central
Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central在2025-11达47.508MW,相较于2025-10的47.508MW保持不变。Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central数据按月度更新,2008-01至2025-11期间平均值为22.280MW,共215份观测结果。该数据的历史最高值出现于2025-11,达47.508MW,而历史最低值则出现于2010-01,为16.280MW。CEIC提供的Electricity: Installed Capacity: Utilities: Nuclear: Uttarakhand: Central数据处于定期更新的状态,数据来源于Central Electricity Authority,数据归类于India Premium Database的Energy Sector – Table IN.RBB: Electricity: Installed Capacity: Utilities: by State and Sector: Nuclear。
| 数值 | 频率 | 范围 |
|---|---|---|
| 47.508 2025-11 | 月度 | 2008-01 - 2025-11 |